![]() |
![]() |
![]() |
![]() |
This design/build project was for the design of a sluice gate controlled dual arch culvert to control water flow from the Willamette River into the Delta Ponds system. Culvert design included a stop log feature and fixed fish passage bottom with v-channels for low flow conditions. Design and construction was coordinated with the Army Corps of Engineers, City of Eugene and the contractor, Pro Landscape, Inc.